The Building is a 2 storey reinforced concrete
structure of 3243m2 built on the site of the old Gold
Mine workings.
The building was supported on precast driven concrete
piles and both floor slabs were post tensioned. Perimeter
Walls were precast concrete panels with double glazed
windows and featured an Alucobond Fascia and Soffit and
eaves overhang.
The ground floor consists of 3 operating theatres and
numerous ancillary rooms, 1st and 2nd stage recovery areas,
while on the first floor are 6 X 6 room consulting suites,
a blood pathology laboratory and major plant room
Externally carpark works and significant landscaping was
carried out to enhance the overall project.
|